Pohjois-Suomen Perustuspalvelun työnjohtajat ja pakettiauto betonirungon työmaalla
Pohjois-Suomen Perustuspalvelun työnjohtajat ja pakettiauto betonirungon työmaalla
Pohjois-Suomen Perustuspalvelun työnjohtajat ja pakettiauto betonirungon työmaalla

Foundation and concrete contracting across Finland

Footings, plinths, large-formwork construction and precast element installation for construction companies,
developers and home builders.

Our own equipment, FISE qualification and more than 25 years of experience.

Footings, plinths, large-formwork construction and

precast element installation for construction companies,
developers and home builders.

Our own equipment, FISE qualification and more than 25 years of experience.

Concrete construction

Every project phase
from one partner

Yksi urakoitsija
koko perustus- ja betonivaiheelle.

Professionals

Homeowners

Six good reasons

Why Perustuspalvelu?

——

Why Perustuspalvelu?

——

Pohjois-Suomen Perustuspalvelu is a construction company specialising in foundation contracting and demanding concrete work. In addition to plinths, our expertise covers soil investigations, foundation design, large-formwork construction and precast element installation.

Our quality is backed by the FISE qualification for supervising exceptionally demanding concrete structures, which allows us to deliver even the most technically challenging projects professionally.

Benefit from more than 25 years of experience and expertise in demanding foundation work.

Pohjois-Suomen Perustuspalvelu is a construction company specialising in foundation contracting and demanding concrete work. In addition to plinths, our expertise covers soil investigations, foundation design, large-formwork construction and precast element installation.

Our quality is backed by the FISE qualification for supervising exceptionally demanding concrete structures, which allows us to deliver even the most technically challenging projects professionally.

Benefit from more than 25 years of experience and expertise in demanding foundation work.

Luotettava Kumppani -merkki
Perustuspalvelun huomioliivi ja työkaluvyö betonisokkelin päällä työmaalla
Perustuspalvelun työliivi ja työkaluvyö betonisokkelin päällä työmaalla

Solid experience

Thousands of foundations built since 1998, from detached houses to demanding industrial projects.

The whole foundation phase from one contractor

Soil investigation, foundation design, formwork, reinforcement and casting. One contract, one point of responsibility.

The whole foundation phase from one contractor

Soil investigation, foundation design, formwork, reinforcement and casting. One contract, one point of responsibility.

Clear quotation

You always know the cost of your foundation project in advance

Clear quotation

You always know the cost of your foundation project in advance

Our own equipment and staff

We don't depend on a chain of subcontractors, so the work progresses without interruptions.

Our own equipment and staff

We don't depend on a chain of subcontractors, so the work progresses without interruptions.

Foundations in winter too

Winter concreting and weather protection are part of our standard equipment. Your project doesn't have to wait for spring.

Foundations in winter too

Winter concreting and weather protection are part of our standard equipment. Your project doesn't have to wait for spring.

Staying on schedule

The agreed start and completion dates hold, so the next phases on site can be scheduled accordingly.

Staying on schedule

The agreed start and completion dates hold, so the next phases on site can be scheduled accordingly.

A foundation that is good to build on

A foundation that is good to build on

Foundations account for only a small part of the building costs, but their importance is decisive. We know you want a high-quality, dimensionally accurate foundation that gives your house solid support for generations. Without worries.

Well planned is half done

The work on site has to run quickly and on schedule, sometimes in just a few days. We make sure of this with careful advance planning and formwork dimensioning.

High-quality formwork, our own formwork transport and skilled staff ensure a high-quality result, and that we stay on the agreed schedule.

Our services also include turnkey contracts: everything from the soil investigation to the design and casting of your house's foundations, including the final clean-up. With one contract you get a durable base for your building project quickly and easily.

We build foundations even in winter

In freezing weather we use heating cables in the concrete, and the concrete arrives on site pre-heated. We monitor the temperature electronically, so our site supervisors can make sure the concrete does not get too cold. To prevent this, we protect the castings from the cold. If the temperature still drops and triggers an alarm, we react immediately and heat the casting. This way we can guarantee successful foundation work in winter too.

We leave the site clean

After casting the plinth we clean up and dispose of the construction waste. All we leave on your plot is a solid foundation that is good to build on.

Kaksi Perustuspalvelun työntekijää kättelee työmaalla kerrostalon edessä
Kaksi Perustuspalvelun asentajaa työmaalla kerrostalon edessä
Perustuspalvelun pakettiauto rakennustyömaalla
Perustuspalvelun pakettiauto betonirunkoisen rakennuksen työmaalla

Steps

Foundations for your plot

Perustuspalvelu's team secures the most important purchase of your life. A solid foundation is good to build on.

1. Quotation

Request a quote easily with the quote form or by emailing us the drawings of your building project.

1. Quotation

Request a quote easily with the quote form or by emailing us the drawings of your building project.

2. Order, design and scheduling

With one contract you get a durable base for your building project quickly and easily. We ensure smooth progress with careful advance planning and formwork dimensioning.

2. Order, design and scheduling

With one contract you get a durable base for your building project quickly and easily. We ensure smooth progress with careful advance planning and formwork dimensioning.

3. Formwork, casting and clean-up

The work on site runs quickly and on schedule, sometimes in just a few days. After casting the plinth we clean up and dispose of the construction waste.

3. Formwork, casting and clean-up

The work on site runs quickly and on schedule, sometimes in just a few days. After casting the plinth we clean up and dispose of the construction waste.

Request a quote

Feedback

What our customers say

Over the years we have built the foundations of thousands of buildings and thousands of square metres with large formwork.

See our completed projects

Questions & answers

Frequently asked questions

Perustuspalvelun työntekijä kypärässä betoniseinän vieressä

What information do you need for a soil investigation?

For a soil investigation we need the location of the planned building and its draft drawings.

What drawings do you need for foundation design?

For foundation design we need: - The soil investigation - Site plans - Floor plans - Section drawings of the building

What needs to be arranged on the plot before foundation work starts?

Before work starts, the plot must have: - A load-bearing access road The plot needs a load-bearing access road for a van, a concrete truck and a truck carrying hollow-core slabs. In winter the access roads must be ploughed. - A prepared building base The base must be levelled and compacted to a tolerance of -0/+30 mm. How the base is built is specified in the ground structure plan of the soil investigation. - Corner markers The corners of the house must be marked on the crushed-stone bed. They are usually marked by the municipality or city. - Electricity Electricity should be available during construction. If it is not yet available, please let us know in advance. In winter we need electricity to heat the concrete.

How much time should be reserved for building the foundations?

Building the foundations for a detached house takes about 2–3 days. If the project also includes hollow-core slabs, a garage or other outbuildings, the work takes about 5 days.

How soon can work continue after the foundations are done?

We recommend waiting about 1–2 days after the formwork has been removed. Depending on the weather, the interior backfilling can start earlier.

How much do foundations cost?

On load-bearing, level ground, the foundations of a detached house often cost €5,000–10,000. Many factors affect the loads and the cost of the foundations. If the house is on a slope or the soil is loose, the total price can exceed €20,000.

Talk to an expert

Questions? Contact us or send your question with a quote request.

Questions & answers

Frequently asked questions

Asentaja paikallavalettujen kellarin seinien ja muottien keskellä

What information do you need for a soil investigation?

For a soil investigation we need the location of the planned building and its draft drawings.

What drawings do you need for foundation design?

For foundation design we need: - The soil investigation - Site plans - Floor plans - Section drawings of the building

What needs to be arranged on the plot before foundation work starts?

Before work starts, the plot must have: - A load-bearing access road The plot needs a load-bearing access road for a van, a concrete truck and a truck carrying hollow-core slabs. In winter the access roads must be ploughed. - A prepared building base The base must be levelled and compacted to a tolerance of -0/+30 mm. How the base is built is specified in the ground structure plan of the soil investigation. - Corner markers The corners of the house must be marked on the crushed-stone bed. They are usually marked by the municipality or city. - Electricity Electricity should be available during construction. If it is not yet available, please let us know in advance. In winter we need electricity to heat the concrete.

How much time should be reserved for building the foundations?

Building the foundations for a detached house takes about 2–3 days. If the project also includes hollow-core slabs, a garage or other outbuildings, the work takes about 5 days.

How soon can work continue after the foundations are done?

We recommend waiting about 1–2 days after the formwork has been removed. Depending on the weather, the interior backfilling can start earlier.

How much do foundations cost?

On load-bearing, level ground, the foundations of a detached house often cost €5,000–10,000. Many factors affect the loads and the cost of the foundations. If the house is on a slope or the soil is loose, the total price can exceed €20,000.

Talk to an expert

Questions? Contact us or send your question with a quote request.

Questions & answers

Frequently asked questions

Asentaja paikallavalettujen kellarin seinien ja muottien keskellä

What information do you need for a soil investigation?

For a soil investigation we need the location of the planned building and its draft drawings.

What drawings do you need for foundation design?

For foundation design we need: - The soil investigation - Site plans - Floor plans - Section drawings of the building

What needs to be arranged on the plot before foundation work starts?

Before work starts, the plot must have: - A load-bearing access road The plot needs a load-bearing access road for a van, a concrete truck and a truck carrying hollow-core slabs. In winter the access roads must be ploughed. - A prepared building base The base must be levelled and compacted to a tolerance of -0/+30 mm. How the base is built is specified in the ground structure plan of the soil investigation. - Corner markers The corners of the house must be marked on the crushed-stone bed. They are usually marked by the municipality or city. - Electricity Electricity should be available during construction. If it is not yet available, please let us know in advance. In winter we need electricity to heat the concrete.

How much time should be reserved for building the foundations?

Building the foundations for a detached house takes about 2–3 days. If the project also includes hollow-core slabs, a garage or other outbuildings, the work takes about 5 days.

How soon can work continue after the foundations are done?

We recommend waiting about 1–2 days after the formwork has been removed. Depending on the weather, the interior backfilling can start earlier.

How much do foundations cost?

On load-bearing, level ground, the foundations of a detached house often cost €5,000–10,000. Many factors affect the loads and the cost of the foundations. If the house is on a slope or the soil is loose, the total price can exceed €20,000.

Talk to an expert

Questions? Contact us or send your question with a quote request.

Our location

We serve customers all over Finland and in
northern Sweden


Pohjois-Suomen Perustuspalvelu

Lumijoentie 1109, 91980 Lumijoki

Our location

We serve customers all over Finland and in
northern Sweden


Pohjois-Suomen Perustuspalvelu

Lumijoentie 1109, 91980 Lumijoki

Our location

We serve customers all over Finland and in
northern Sweden


Pohjois-Suomen Perustuspalvelu

Lumijoentie 1109, 91980 Lumijoki